Skip to main content
Trade supplier of professional cleaning equipment · All prices ex VAT

Burner Coils & Equipment

283 products
283 productsHelp choosing? 015395 66193
Need help choosing? Call 015395 66193

Shop by type

7 types · swipe for more
283 products
SKU GS6200558

Burner Inlet Adaptor

In
¼" BSP Male
In stock · next-day delivery
£13.50ex VAT£16.20 inc VAT
SKU GS1208406

Burner Motor 110V

Available on backorder · approx 2–3 weeks
£266.00ex VAT£319.20 inc VAT
SKU TPTH9565

Thermostat Housing

In stock · next-day delivery
£14.70ex VAT£17.64 inc VAT
SKU TP43PFF

43 Micron Fuel Filter

In
Hosetail
Out
Hose Tail ⌀ 6mm (¼)
In stock · next-day delivery
£3.60ex VAT£4.32 inc VAT
SKU GSCDR16

Sootbreaker CDR16

In stock · next-day delivery
£11.80ex VAT£14.16 inc VAT
Page 5 of 8

About Burner Coils & Equipment

Diesel pressure washer boilers need servicing at least once a year. We recommend fitting a new fuel filter, electrodes, fuel nozzle and soot breaker at each service. The fuel pump pressure should also be calibrated, as incorrect pressure can cause poor combustion.

Not sure which part you need? Call us on 015395 66193 with your machine model and our team will help.

Hot pressure washers have a boiler/coil that heats cold water fed from the pressure pump. Typically, the machines PCB or other control systems will look for water pressure, the flow of water, spark, fuel level, and temperature setting. Once these are in place the fuel solenoid will energise and open allowing fuel to the burner head. The fast-flowing air from the blower motor and the fuel-injected will then allow for a constant flame.

The boiler coil is normally made from mild steel and can come in varying in lengths, from 15- 45 m long. The steel is normally 3/8 in bore. Either due to wear,  frost or just unlucky you may find the boiler full of water. This would really mean you need to replace the coil.

 

When buying a pressure washer boiler coil please check all dimensions and thread sizes to ensure you get the correct one.

 

Removing a coil

 

  • IPC/ Edge machines have an O ring and a white backing ring. (Don’t lose these!)
  • Nilfisk Neptune 5 and MH5 plus allows for a service crane to be used in order to lift it out
  • Karcher, Kew, Kranzle, DTE, Dirt Driver, MAC, and many more simply needs a strong person to lift them out.  Keep an eye on the orientation that the coil came out.

 

Once the coil has been removed, make sure the boiler jacket and fan is clean. If funds are good to replace the fuel jet and electrodes. This combination of cleaning and re renewing parts will allow the boiler to have the best start when firing up for the first time.